Valley Professional

Stearns was brought on board early at the recommendation of LCG Pence due to their expertise with design-build steel-framed systems. Stearns worked with the Engineer-of-Record to design the foundation, steel frame floor and roof system, and the exterior skin support from the ground level through the roof. Stearns detailed the project in-house, recommended and procured the most efficient and economical structural system, and administered an aggressive construction schedule. This unique 31,500 sq.ft. structure consists of two levels above ground-level parking.

Project Details

Client: Valley Health & Postal Employee Credit Union

Location: Salem, Oregon

Contractor: LCG Pence

Architect: Studio 3 Architecture

Engineer-of-Record: Devco Engineering

Size: 31,500 square feet

Number of Levels: 3

System Type: Structural Steel

Completion Date: 2005