|
| ||
| Project: | Emerald Queen Casino Addition, Phase 1B, Parking | |
| Contractor: | Aecon Buildings | |
| Location: | Fife, WA | |
| Project Description | ||
A 74,000 sq.ft., 2-story, steel-framed casino expansion along with two new parking structures offering more than 2,000 parking stalls. The addition is expected to turn Emerald Queen Casino into one of the top gaming centers in the state of Washington. Stearns was brought on-board to assist with design development, detail drawings for fabrication and construction, provide the most economical structural steel system and manage and execute an aggressive steel construction schedule. Close coordination was achieved with casino operations to allow the expansion to proceed with minimal impact to the casino. | ||




